Jilin High-tech zone held a flood control work deployment meeting

来源:   时间: 2024-07-22 17:50
  On July 22, Zhou Yu, deputy director of the Management Committee of Jilin High-tech Zone, presided over a meeting on flood control work deployment。
  The meeting stressed that all departments and units should comply with the relevant requirements of the provincial and municipal flood control work deployment conference,We must firmly establish bottom-line thinking and limit thinking, and put people and life first.With the sense of responsibility of "always at ease"We will do a solid job in flood control and flood preparedness
  As requested by the meeting,It is necessary to clarify the objectives of flood control work, sort out and improve the hidden dangers, personnel, measures, materials and other four lists, and in-depth investigation of safety hazards。It is necessary to clarify the main body of the responsibility for flood control, all member units should strengthen emergency drills, refine and improve emergency plans, and ensure that the responsibility is transferred to the person and the work is implemented in detail。It is necessary to clarify the working mechanism of flood control, improve the four mechanisms of early warning and forecasting, consultation, dispatching and coordination, and enrich and improve flood control materials and equipment。It is necessary to clarify the discipline of flood control work, strengthen duty and ensure smooth communication。At the same time, it is necessary to strengthen supervision and inspection, check the gaps and make up for leaks, and ensure the safety of the flood。
  会议传达了习近平总书记重要指示和李强总理指示要求以及省、市防汛工作会议精神。The Emergency Management Bureau of High-tech Zone, the Housing and Construction Bureau, Gaoxin Street and New North Street reported the work deployment of the main flood season respectively。
  Jilin High-tech Zone flood control and drought relief headquarters member units responsible persons attended the meeting。